Search Results

Refine

Result Type

1 - 3 of 3 Products for 'Cx 10lde 5' Page 1 of 1 |
  • 1

Cx 10lde 5

COHR DiamondCx-10LDE Plus DS 0618 1a.pdf

COHR DiamondCx-10LDE Plus DS 0618 1a.pdf

…stability after 10 minute warm-up)
Pulse Rise and Fall Time (µsec) 1 (10% to 90%)
Beam Quality (M2) 1.2
Beam Output Diameter (mm) 5.0 ± 0.2 5.0 ± 0.2 4.0 ± 0.2 4.0 ± 0.2
Beam Waist Diameter (mm) 3.4 ± 0.2 3.4 ± 0.2 2.8 ± 0.2 2.8 ± 0.2
Beam Divergence (mrad) (full angle) 5.5…

COHR DiamondCx-10LDE plus DS 0219 1.pdf

COHR DiamondCx-10LDE plus DS 0219 1.pdf

…centroid change between a 5% AOM duty cycle and a 95% AOM duty cycle. Steady state is defined as the angular beam centroid location
after 1 minute of operation at the specific AOM duty cycle and with a 100% Cx-10 duty cycle after a 10 minute Cx-10 warm up period.
5 Operation at pulse…

COHR DiamondCx-10LDE plus DS 1219 2.pdf

COHR DiamondCx-10LDE plus DS 1219 2.pdf

…centroid change between a 5% AOM duty cycle and a 95% AOM duty cycle. Steady state is defined as the angular beam centroid location after 1 minute of operation at the specific AOM duty cycle
and with a 100% Cx-10 duty cycle after a 10 minute Cx-10 warm up period.
5 Refer to Mechanical…