Ask a Question
Coherent
Search Results
Refine

Result Type

1 - 3 of 3 Products for 'Field Max Ii Software' Page 1 of 1 |
  • 1

Field Max Ii Software

FieldMaxII-TOP

FieldMaxII-TOP

…battery is drained. The meter can also operate with six standard AA batteries. Specifications Max. Measurable Power (with thermopile sensor) 30.0 kW Max. Measurable Power (with optical sensor) 300.0 mW Max. Measurable Energy (with pyroelectric sensor) 300.0J Min. Measurable Power (with thermopile…

FieldMaxII-P

FieldMaxII-P

…300.0J (manual ranging) Measurement Resolution 0.1% of full scale Max. Rep. Rate (pulsed energy measurement) 300 Hz (every pulse) Accuracy - Digital Meter ±1.0% of reading Accuracy - System Meter accuracy + sensor accuracy Software This current version of the Setup file contains updated and improved…

FieldMaxII-TO

FieldMaxII-TO

…lasers. The updated FieldMaxII-TO (RoHS) system features an enhanced PC applications software package that provides live simultaneous monitoring and control of multiple meters from a single host computer. This software provides a quick and easy way to use your PC to monitor live data and statistics,…

Powered by Site Search powered by SLI Systems

Call 1-800-227-8840


Outside the U.S. 1-408-764-4983

Coherent has locations across the globe that are available to provide support for any product, service or inquiry.

Visit our Contact Page to connect with any of our global sites.


Corporate Headquarters
Coherent Inc.
5100 Patrick Henry Drive
Santa Clara, CA 95054 USA

email: tech.sales@coherent.com

Send Us a Message

Please Read Before Continuing

Risk factors: Except for the historical information contained here, many of the matters discussed in this Web site are forward-looking statements, based on expectations at the time they were made, that involve risks and uncertainties that could cause our results to differ materially from those expressed or implied by such statements. These risks are detailed in the “Factors That May Affect Future Results” section of our latest 10-K or 10-Q filing. Coherent assumes no obligation to update these forward-looking statements.


I have read the terms and conditions