Search Results

Refine

Result Type

1 - 12 of 18 Products for 'Nitrogen Purge' Page 1 of 2 |

Nitrogen Purge

00 E-250 Pre.book

00 E-250 Pre.book

…from this aperture.
Nitrogen Purge Provides for the mandatory gas purge of the beam conditioning optics. Requires
1/4 inch (6.3 mm) OD Teflon, polyethylene or polypropylene tubing.
Standard gas fitting for purging the optics in the laser head. Nitrogen is not
required for tube…

00 SabreMFreD Preinstall.book

00 SabreMFreD Preinstall.book

…crystal.
· The Nitrogen purge must be turned on.
Failure to follow these requirements will likely result in irreversible damage from condensation of water vapor on the crystal
Brewster surfaces. When the system is in operation, the
Nitrogen purge must be on.
Environmental…

DIAMOND J-3 Series OEM Lasers Preinstallation Manual, Rev. AB

DIAMOND J-3 Series OEM Lasers Preinstallation Manual, Rev. AB

…in.] STUD
COOLANT OUTLET
3/8 NPT
48 VDC NEGATIVE (-) CONNECTION
Ø 9.5 mm [.375 in.] STUD
INTERFACE CONNECTIONS
NITROGEN PURGE
PUSH TO CONNECT TUBE FITTING
Ø 6.35 mm
[.250 in.]
COOLANT INLET
3/8 NPT
INTERFACE EMBEDDED CONTROL
RJ-45 JACK…

00 Sabre Preinstall.book

00 Sabre Preinstall.book


Selecting The Correct Cooling Water Temperature.......................................................4
Nitrogen Purge (UVoption only)...................................................................................8
Environmental…

Diamond J-2 Series OEM Lasers Preinstallation Manual, Rev. AB

…from this aperture.
Nitrogen Purge Provides for the mandatory gas purge of the beam conditioning optics. Requires
1/4 inch (6.3 mm) OD Teflon, polyethylene or polypropylene tubing.
Standard gas fitting for purging the optics in the laser head. Nitrogen is not
required for tube…

DIAMOND J-5V Series OEM Lasers Preinstallation Manual, Rev. AA

DIAMOND J-5V Series OEM Lasers Preinstallation Manual, Rev. AA

…from this aperture.
Nitrogen Purge Provides for the mandatory gas purge of the beam conditioning optics. Requires
1/4 inch (6.3 mm) OD Teflon, polyethylene or polypropylene tubing.
Standard gas fitting for purging the optics in the laser head. Nitrogen is not
required for tube…

00 E-1000 PreInst.book

00 E-1000 PreInst.book


EXTENDED I/O
4
DCPS/AUXILIARY I/O
3
EMBEDDED CONTROL/
DIAGNOSTICS
2
COOLANT INLET
3/4 NPT
1 NITROGEN PURGE
1/8 NPT
13
COOLANT OUTLET
3/4 NPT
12
FWD & REFL
POWER MONITOR
11
- 48 VDC RETURN 10
LASER…

00 E-400 E-1000 Series Preinstall.book

00 E-400 E-1000 Series Preinstall.book


[1.97 in.]
REALTIME I/O
SHUTTER LED
EXTENDED I/O
DCPS / AUXILIARY I/O
EMBEDDED CONTROL /
DIAGNOSTICS
NITROGEN PURGE
1/4 NPT
COOLANT INLET
1/4 NPT
COOLANT OUTLET
1/4 NPT
POWER INDICATION LED
+ 48 VDC
- 48 VDC RETURN

DIAMOND J-5 Series OEM Lasers Preinstallation Manual Rev AA

DIAMOND J-5 Series OEM Lasers Preinstallation Manual Rev AA


3/8 NPT
48 VDC NEGATIVE (-) CONNECTION
Ø9.5 mm [.375 in.] STUD
REAL TIME CONNECTOR
25 POSITION (PINS)
INTERFACE EMBEDDED CONTROL
RJ-45 JACK
COOLANT INLET
3/8 NPT
NITROGEN PURGE
PUSH TO CONNECT TUBE FITTING
Ø6.35 mm
[.250 in.]

Diamond J-3 Series OEM Lasers Preinstallation Manual, Rev. AC

Diamond J-3 Series OEM Lasers Preinstallation Manual, Rev. AC

…in.] STUD
COOLANT OUTLET
3/8 NPT
48 VDC NEGATIVE (-) CONNECTION
Ø 9.5 mm [.375 in.] STUD
INTERFACE CONNECTIONS
NITROGEN PURGE
PUSH TO CONNECT TUBE FITTING
Ø 6.35 mm
[.250 in.]
COOLANT INLET
3/8 NPT
INTERFACE EMBEDDED CONTROL
RJ-45 JACK…

Diamond J-5 Series OEM Lasers Preinstallation Manual, Rev. AC


3/8 NPT
48 VDC NEGATIVE (-) CONNECTION
Ø9.5 mm [.375 in.] STUD
REAL TIME CONNECTOR
25 POSITION (PINS)
INTERFACE EMBEDDED CONTROL
RJ-45 JACK
COOLANT INLET
3/8 NPT
NITROGEN PURGE
PUSH TO CONNECT TUBE FITTING
Ø6.35 mm
[.250 in.]

MetaBEAM1000c Pre.book

MetaBEAM1000c Pre.book

Site Preparation
1 - 13
Nitrogen is also used to purge the laser of the LMT system. No other
gas should be used in place of Nitrogen.
DANGER!
No other gas should be used in place of Nitrogen to purge the
laser of the LMT system. Using other gases may result in a fire.…

Please Read Before Continuing

Risk factors: Except for the historical information contained here, many of the matters discussed in this Web site are forward-looking statements, based on expectations at the time they were made, that involve risks and uncertainties that could cause our results to differ materially from those expressed or implied by such statements. These risks are detailed in the “Factors That May Affect Future Results” section of our latest 10-K or 10-Q filing. Coherent assumes no obligation to update these forward-looking statements.


I have read the terms and conditions