Search Results

13 - 24 of 33 Products for 'Water Chiller Manual' Page 2 of 3 |

Water Chiller Manual

Paladin Advanced Preinstallation.book

Paladin Advanced Preinstallation.book

…the three LEDs turn on, continue
to carefully add coolant to the system. When the yellow LED
turns off, and remains off, reset the chiller. To reset the chiller,
Figure 3-6. Chiller and Laser Head Water Connections
Chiller Water Connections
Laser Head Water Connections

DIAMOND J-3 Series OEM Lasers Preinstallation Manual, Rev. AB

DIAMOND J-3 Series OEM Lasers Preinstallation Manual, Rev. AB

…minimize the pressure drop from the chiller to the laser
system. Do not exceed the maximum hose length specified by the
chiller manufacturer.
A suitable water filter should be connected as shown in Figure 3-1
on the input water line from the chiller.
Shut-off valves on the…

Revolution High-Power Q-Switched Laser System Preinstallation Manual

Revolution High-Power Q-Switched Laser System Preinstallation Manual

Revolution Laser Preinstallation Manual
2 - 4
Figure 2-2. Connection Block Diagram
Figure 2-3. External Interlock Circuit Diagram
220VAC
12A
50Hz/60Hz
RF BNC
Water Out
Water In
115VAC
10A/5A
50Hz/60Hz
Notebook
Computer
4-Pin…

DIAMOND J-5 Series OEM Lasers Preinstallation Manual Rev AA

DIAMOND J-5 Series OEM Lasers Preinstallation Manual Rev AA

…minimize the pressure drop from the chiller to the laser
system. Do not exceed the maximum hose length specified by the
chiller manufacturer.
A suitable water filter should be connected as shown in Figure 3-1
on the input water line from the chiller.
Shut-off valves on the…

Avia preinstall.book

Avia preinstall.book

…fault protection.
Installing the
Water Chiller
If the water chiller to be used is provided by Coherent (water chiller
available separately) it will have a separate operation manual with
the installation instructions. The chiller will be shipped with plastic
tubing and…

Diamond J-5 Series OEM Lasers Preinstallation Manual, Rev. AC

…minimize the pressure drop from the chiller to the laser
system. Do not exceed the maximum hose length specified by the
chiller manufacturer.
A suitable water filter should be connected as shown in Figure 3-1
on the input water line from the chiller.
Shut-off valves on the…

Diamond J-2 Series OEM Lasers Preinstallation Manual, Rev. AB

…minimize the pressure drop from the chiller to the laser
system. Do not exceed the maximum hose length specified by the
chiller manufacturer.
A suitable water filter should be connected as shown in Figure 3-1
on the input water line from the chiller.
Shut-off valves on the…

Diamond J-3 Series OEM Lasers Preinstallation Manual, Rev. AC

Diamond J-3 Series OEM Lasers Preinstallation Manual, Rev. AC

…minimize the pressure drop from the chiller to the laser
system. Do not exceed the maximum hose length specified by the
chiller manufacturer.
A suitable water filter should be connected as shown in Figure 3-1
on the input water line from the chiller.
Shut-off valves on the…

Diamond J-3-5 Series OEM Lasers Preinstallation Manual, Rev. AA

Diamond J-3-5 Series OEM Lasers Preinstallation Manual, Rev. AA

…minimize the pressure drop from the chiller to the laser
system. Do not exceed the maximum hose length specified by the
chiller manufacturer.
A suitable water filter should be connected as shown in Figure 3-1
on the input water line from the chiller.
Shut-off valves on the…

DIAMOND J-5V Series OEM Lasers Preinstallation Manual, Rev. AA

DIAMOND J-5V Series OEM Lasers Preinstallation Manual, Rev. AA

…minimize the pressure drop from the chiller to the laser
system. Do not exceed the maximum hose length specified by the
chiller manufacturer.
A suitable water filter should be connected as shown in Figure 3-1
on the input water line from the chiller.
Shut-off valves on the…

00 M5C Pre Install.book

00 M5C Pre Install.book

…Pre-Installation Manual
3 - 16
Liquid Cooling
System
The M5C LMT system requires an external, closed-loop water
cooling system. This requirement is satisfied by a commercially
available chiller or an existing cooling system. Coherent supplies
chillers from…

Quick Setup.fm

Quick Setup.fm


1. Hook the laser head to the chiller using the provided hardware, see Figures 1 - 3.
Note, for increased visibility the umbilical has been removed from the laser head in Figure 3.
2. Fill the chiller reservoir with distilled water, start the chiller (see Figure 4), and inspect all…