Search for Lasers, Laser Systems, Laser Measurment, Laser Service Coherent Inc., Worldwide websites Coherent Inc., calendar of events Coherent Inc., office locator Coherent Inc., Service Centers
     > Search
Search Coherent
Coherent Inc.
Superior Reliability & Performance
  • Lasers and Laser-based Systems
  • Laser Measurement and Control
  • Precision Optics
  • Related Accessories
Please enter a search phrase.

1 - 10 of 20 Search Results for baseplate verdi

1Not Modelocking
... Supporting critical environments Highest level of post-sale customer care Long-term customer relationships For Vitesse lasers – Verify the baseplate is 25 ± 1ºCelsius. Optimum alignment of the Verdi pump beam into the ultrafast head can only be achieved if the baseplate temperature is 25 ± 1ºCelsius ...

2pdf document  Verdi_V18_Preinstallation  (PAGE 9 OF 18)
Verdi V-18 Laser Preinstallation Manual 3 The laser head is shipped with a protective plastic plate installed over the baseplate. Leave the plastic plate in place until laser head is ready for installation. 1. Remove the packing material from the riser/heat sink (Figure 1-2). 2. Insert two dowel pins ...

3pdf document  Verdi_V2-V5-V6_Preinstallation  (PAGE 7 OF 18)
Verdi V-2/V-5/V-6 Laser Preinstallation Manual 1 Introduction The purpose of this document is to assist the user in establishing a suitable location and operating environment for optimum Verdi V-2/V-5/V-6 performance. Receiving and Inspection Inspect shipping containers for signs of rough handling ...
Related Searches: mira | verdi v2

4pdf document  Verdi_V2-V5-V6_Preinstallation  (PAGE 9 OF 18)
Verdi V-2/V-5/V-6 Laser Preinstallation Manual 3 The laser head is shipped with a protective plastic plate installed over the baseplate. Leave the plastic plate in place until laser head is ready for installation. 1. Remove the packing material from the riser/heat sink (Figure 1-2). 2. Insert two dowel ...

5pdf document  Verdi_V2-V5-V6_Preinstallation  (PAGE 12 OF 18)
Verdi V-2/V-5/V-6 Laser Preinstallation Manual 6 Each customer must inspect the power cord and install the proper connector if necessary. The connector should be installed in a properly grounded outlet with a maximum of 10 Ampere service @ 110 V and 11 Ampere service @ 220 V for proper overcurrent ...
Related Searches: verdi laser manual

6pdf document  Verdi_V2-V5-V6_Preinstallation  (PAGE 14 OF 18)
Verdi V-2/V-5/V-6 Laser Preinstallation Manual 8 5. The interlock circuit in Verdi operates from a +/-12 VDC circuit. Its current is limited to around 1 mA. For these ratings, a "dry-circuit" type switch will give the most reliable operation. Figure 1-6. Interconnect Diagram Table 1-1. Utility ...

7Clogged Water Flow
... experience Supporting critical environments Highest level of post-sale customer care Long-term customer relationships Clogged Water Flow For Avia, Verdi and Vitesse lasers – Ensure distilled water is used in the chiller. Do not use deionized water, or hard water. Deionized water is corrosive. Hard ...
Related Searches: chiller | water chiller | verdi manual | verdi laser manual

8Beam Pointing Instability
... Solutions 40+ years of experience Supporting critical environments Highest level of post-sale customer care Long-term customer relationships For Verdi lasers – Stabilize head baseplate temperature. Verify that the ambient temperature is not excessive, or abnormally unstable. If the head is water-cooled ...
Related Searches: pointing stability | verdi v-10 | verdi v10

9pdf document  Azure266_DSrev1_092303 Best match in this PDF  |  All matches in this PDF
... .5 lb.) Operating Thermal Requirements +15 to +30°C operating, stabilized to ±2°C in a non-condensing environment Laser Head Closed-loop chiller for baseplate Power Supply Air-cooled Shipping Thermal Requirements -20 to +50°C shipping in a non-condensing environment Orientation Horizontal ±2° Power Supply ...
Related Searches: us locations | 266nm cw laser | 266nm | field max top

10pdf document  Verdi_V8-V10_Preinstallation  (PAGE 7 OF 18)
Verdi V-8/V-10 Laser Preinstallation Manual 1 Introduction The purpose of this document is to assist the user in establishing a suitable location and operating environment for optimum Verdi V-8/V-10 performance. Receiving and Inspection Inspect shipping containers for signs of rough handling or damage ...


Page 1 2 of 2 | Next


Site Search by  Site Search powered by SLI Systems