... Supporting critical environments Highest level of post-sale customer care Long-term customer relationships For Vitesse lasers – Verify the baseplate is 25 ± 1ºCelsius. Optimum alignment of the Verdi pump beam into the ultrafast head can only be achieved if the baseplate temperature is 25 ± 1ºCelsius ...
Verdi V-18 Laser Preinstallation Manual 3 The laser head is shipped with a protective plastic plate installed over the baseplate. Leave the plastic plate in place until laser head is ready for installation. 1. Remove the packing material from the riser/heat sink (Figure 1-2). 2. Insert two dowel pins ...
Verdi V-2/V-5/V-6 Laser Preinstallation Manual 1 Introduction The purpose of this document is to assist the user in establishing a suitable location and operating environment for optimum Verdi V-2/V-5/V-6 performance. Receiving and Inspection Inspect shipping containers for signs of rough handling ... Related Searches:mira | verdi v2
Verdi V-2/V-5/V-6 Laser Preinstallation Manual 3 The laser head is shipped with a protective plastic plate installed over the baseplate. Leave the plastic plate in place until laser head is ready for installation. 1. Remove the packing material from the riser/heat sink (Figure 1-2). 2. Insert two dowel ...
Verdi V-2/V-5/V-6 Laser Preinstallation Manual 6 Each customer must inspect the power cord and install the proper connector if necessary. The connector should be installed in a properly grounded outlet with a maximum of 10 Ampere service @ 110 V and 11 Ampere service @ 220 V for proper overcurrent ... Related Searches:verdi laser manual
Verdi V-2/V-5/V-6 Laser Preinstallation Manual 8 5. The interlock circuit in Verdi operates from a +/-12 VDC circuit. Its current is limited to around 1 mA. For these ratings, a "dry-circuit" type switch will give the most reliable operation. Figure 1-6. Interconnect Diagram Table 1-1. Utility ...
... experience Supporting critical environments Highest level of post-sale customer care Long-term customer relationships Clogged Water Flow For Avia, Verdi and Vitesse lasers – Ensure distilled water is used in the chiller. Do not use deionized water, or hard water. Deionized water is corrosive. Hard ... Related Searches:chiller | water chiller | verdi manual | verdi laser manual
... Solutions 40+ years of experience Supporting critical environments Highest level of post-sale customer care Long-term customer relationships For Verdi lasers – Stabilize head baseplate temperature. Verify that the ambient temperature is not excessive, or abnormally unstable. If the head is water-cooled ... Related Searches:pointing stability | verdi v-10 | verdi v10
... .5 lb.) Operating Thermal Requirements +15 to +30°C operating, stabilized to ±2°C in a non-condensing environment Laser Head Closed-loop chiller for baseplate Power Supply Air-cooled Shipping Thermal Requirements -20 to +50°C shipping in a non-condensing environment Orientation Horizontal ±2° Power Supply ... Related Searches:us locations | 266nm cw laser | 266nm | field max top
Verdi V-8/V-10 Laser Preinstallation Manual 1 Introduction The purpose of this document is to assist the user in establishing a suitable location and operating environment for optimum Verdi V-8/V-10 performance. Receiving and Inspection Inspect shipping containers for signs of rough handling or damage ...