Search Results

1 - 12 of 58 Products for 'chiller' Page 1 of 5 |

chiller

DIAMOND J-3 Series OEM Lasers Preinstallation Manual, Rev. AB

DIAMOND J-3 Series OEM Lasers Preinstallation Manual, Rev. AB

…come after the laser system.
Chiller Electrical
Supply
A large industrial chiller normally requires a 230 or 480 VAC,
3-phase electrical supply with its own circuit breaker or fuse
protection and an electrical disconnect. Refer to the chiller
manufacturer's installation…

RAPID FX

RAPID FX

…Voltage [100 - 265] VAC Power Consumption <1500W Temperature (non-condensing) - Laser Head +15 to 30°C (59 to 86°F) Temperature (non-condensing) - Chiller +15 to 30°C (59 to 86°F) Vibration <0.15 g Temperature -10 to +50°C (-14 to 122°F) Temperature Gradient 15°C (59°F) per hour Relative Humidity 5%…

HyperRapid NX - Industrial Picosecond Laser

HyperRapid NX - Industrial Picosecond Laser

…head is a self-contained system where all optical elements, control electronics, and thermo-mechanical management are integrated. It complies with state-of-the-art safety regulation and it is complemented by a selection of off-the-shelf chillers and power supplies to offer the greatest flexibility.

HYPER RAPID Lasers | Coherent

HYPER RAPID Lasers | Coherent

…230 VAC/50 to 60 Hz/2.5 kW Beam Diameter (μm) ~3000 at 1064 nm ~3000 at 1064 nm Bore-Sight Accuracy ±0.5 mm and <5 mrad Warm-Up Time <40 min from chiller start High Power Industrial Picosecond Laser - The HYPER RAPID family of high power industrial picosecond lasers is the higher power version of…

Laser Marking Workstations

Laser Marking Workstations

…module (oscillating table configuration only)
* Digital readout, motorized or programmable upgrade of Z-Axis
* Refrigerated recirculating water chiller for all LME-RM versions (laser dependent)
* Automated Pick ‘N Place parts handling
* Custom Motion Control ability
* Fume extractor, available for…

Paladin Advanced Preinstallation.book

Paladin Advanced Preinstallation.book

…from the chiller. Figure 3-16 shows the connections on the back of
the laser head and chiller. Activate the chiller query with the service
command "CH=1" (see Table 6-3 on page 6-5)
Active Chiller Control The Paladin chiller is preset for "active chiller". "Active chiller"

Preinstallation Manual Paladin Advanced Mode Locked UV Laser System

Preinstallation Manual Paladin Advanced Mode Locked UV Laser System

Description and Specifications
2 - 13
Figure 2-4. Termotek Chiller P307-16273 (for 16W-35W Systems) (Continued)
440

00 LMT Pre.book

00 LMT Pre.book


Communications
Input
Assist Gas
Input
Exhaust Sensor
Input
Outlet to Chiller
Remote Interlock
Remote Fan
Regulator Vent
Inlet from Chiller
Control Air Input
Laser Purge Gas
Input
Relay
Pin 1: N.O. Relay Contact
Pin…

00 E-1000 PreInst.book

00 E-1000 PreInst.book

…come after the laser system.
Chiller Electrical
Supply
A large industrial chiller normally requires a 230 or 480 VAC,
3-phase electrical supply with its own circuit breaker or fuse protection and an electrical disconnect. Refer to the chiller manufacturer's
installation…

00 E-400 E-1000 Series Preinstall.book

00 E-400 E-1000 Series Preinstall.book

…come after the laser system.
Chiller Electrical
Supply
A large industrial chiller normally requires a 230 or 480 VAC,
3-phase electrical supply with its own circuit breaker or fuse protection and an electrical disconnect. Refer to the chiller manufacturer's
installation…

00 Legend Elite Preinstallation.book

00 Legend Elite Preinstallation.book

…Damage may occur for unauthorized changes.
Chiller Fluid
Requirements
Evolution Chiller
The Evolution chiller is a closed loop system that requires premixed
Optishield only.
Vitara Chiller
The Vitara chiller is a closed loop system and requires distilled water…

Verdi preinstall.book

Verdi preinstall.book

…fault protection.
4. Proceed to the paragraph titled, "Installing the Chiller".
Installing the
Chiller
Install and setup the chiller in accordance with the user's manual
furnished with the chiller
Final Installation
and Initial
Turn-On
Procedures

Powered by Site Search powered by SLI Systems

Please Read Before Continuing

Risk factors: Except for the historical information contained here, many of the matters discussed in this Web site are forward-looking statements, based on expectations at the time they were made, that involve risks and uncertainties that could cause our results to differ materially from those expressed or implied by such statements. These risks are detailed in the “Factors That May Affect Future Results” section of our latest 10-K or 10-Q filing. Coherent assumes no obligation to update these forward-looking statements.


I have read the terms and conditions