Ask a Question
Coherent
Search Results
13 - 24 of 96 Products for 'diamond e 400' Page 2 of 8 |

diamond e 400

00 E-400 E-1000 Series Preinstall.book

00 E-400 E-1000 Series Preinstall.book

Diamond E-400 Series OEM Lasers Preinstallation Manual 30 13. Using the shackles provided, latch both eyebolts to the spreader bar as shown in Figure 19. Fully tighten the shackle pin. Figure 19. Attaching Eyebolts to Spreader Bar

00 E-400 E-1000 Series Preinstall.book

00 E-400 E-1000 Series Preinstall.book

Diamond E-400 Series OEM Lasers Preinstallation Manual 28 10. Install eyebolts to each end of the laser system (Figure 16). 11. Ensure both ratchet straps are clear of the laser system (Figure 17). Figure 16. Installation of Eyebolts Figure 17. Clear Straps from Laser System

00 E-400 E-1000 Series Preinstall.book

00 E-400 E-1000 Series Preinstall.book

Diamond E-400 Series OEM Lasers Preinstallation Manual 28 10. Install eyebolts to each end of the laser system (Figure 16). 11. Ensure both ratchet straps are clear of the laser system (Figure 17). Figure 16. Installation of Eyebolts Figure 17. Clear Straps from Laser System

00 E-400 E-1000 Series Preinstall.book

00 E-400 E-1000 Series Preinstall.book

Diamond E-400 Series OEM Lasers Preinstallation Manual 26 6. Two people are required to carefully lift the wooden side panels up and over, exposing the system (Figure 12). 7. Cut the tape securing the top end of the user documents bag from the laser moisture seal bag (Figure 13). Figure 12. E-400…

00 E-400 E-1000 Series Preinstall.book

00 E-400 E-1000 Series Preinstall.book

Diamond E-400 Series OEM Lasers Preinstallation Manual 32 15. Carefully cut open and remove the moisture seal bag (Figure 21). NOTICE! To avoid damage to the laser system, let the system equilibrate to room temperature before opening the moisture seal bag. 16. Locate and remove the sealed plastic…

00 E-400 E-1000 Series Preinstall.book

00 E-400 E-1000 Series Preinstall.book

Diamond E-400 Series OEM Lasers Preinstallation Manual 40 3. Carefully lift the laser system while preventing the free end from moving around. See Figure 27. Figure 27. Vertical Mounting Illustration (2) EYEBOLTS (SUPPLIED BY COHERENT) (3) EYEBOLTS W/ HEX NUTS (REMOVE FROM PROVIDED SPREADER BAR)…

00 E-400 E-1000 Series Preinstall.book

00 E-400 E-1000 Series Preinstall.book

Diamond E-400 Series OEM Lasers Preinstallation Manual 26 6. Two people are required to carefully lift the wooden side panels up and over, exposing the system (Figure 12). 7. Cut the tape securing the top end of the user documents bag from the laser moisture seal bag (Figure 13). Figure 12. E-400…

00 E-400 E-1000 Series Preinstall.book

00 E-400 E-1000 Series Preinstall.book

Diamond E-400 Series OEM Lasers Preinstallation Manual 32 15. Carefully cut open and remove the moisture seal bag (Figure 21). NOTICE! To avoid damage to the laser system, let the system equilibrate to room temperature before opening the moisture seal bag. 16. Locate and remove the sealed plastic…

00 E-400 E-1000 Series Preinstall.book

00 E-400 E-1000 Series Preinstall.book

Diamond E-400 Series OEM Lasers Preinstallation Manual 40 3. Carefully lift the laser system while preventing the free end from moving around. See Figure 27. Figure 27. Vertical Mounting Illustration (2) EYEBOLTS (SUPPLIED BY COHERENT) (3) EYEBOLTS W/ HEX NUTS (REMOVE FROM PROVIDED SPREADER BAR)…

00 E-400 E-1000 Series Preinstall.book

00 E-400 E-1000 Series Preinstall.book

Diamond E-400 Series OEM Lasers Preinstallation Manual 26 6. Two people are required to carefully lift the wooden side panels up and over, exposing the system (Figure 12). 7. Cut the tape securing the top end of the user documents bag from the laser moisture seal bag (Figure 13). Figure 12. E-400…

00 E-400 E-1000 Series Preinstall.book

00 E-400 E-1000 Series Preinstall.book

Diamond E-400 Series OEM Lasers Preinstallation Manual 32 15. Carefully cut open and remove the moisture seal bag (Figure 21). NOTICE! To avoid damage to the laser system, let the system equilibrate to room temperature before opening the moisture seal bag. 16. Locate and remove the sealed plastic…

00 E-400 E-1000 Series Preinstall.book

00 E-400 E-1000 Series Preinstall.book

Diamond E-400 Series OEM Lasers Preinstallation Manual 40 3. Carefully lift the laser system while preventing the free end from moving around. See Figure 27. Figure 27. Vertical Mounting Illustration (2) EYEBOLTS (SUPPLIED BY COHERENT) (3) EYEBOLTS W/ HEX NUTS (REMOVE FROM PROVIDED SPREADER BAR)…

Powered by Site Search powered by SLI Systems

Call 1-800-227-8840


Outside the U.S. 1-408-764-4983

Coherent has locations across the globe that are available to provide support for any product, service or inquiry.

Visit our Contact Page to connect with any of our global sites.


Corporate Headquarters
Coherent Inc.
5100 Patrick Henry Drive
Santa Clara, CA 95054 USA

email: tech.sales@coherent.com

Send Us a Message

Please Read Before Continuing

Risk factors: Except for the historical information contained here, many of the matters discussed in this Web site are forward-looking statements, based on expectations at the time they were made, that involve risks and uncertainties that could cause our results to differ materially from those expressed or implied by such statements. These risks are detailed in the “Factors That May Affect Future Results” section of our latest 10-K or 10-Q filing. Coherent assumes no obligation to update these forward-looking statements.


I have read the terms and conditions