Ask a Question
Coherent
Search Results
25 - 36 of 281 Products for 'diamond e1000' Page 3 of 24 |
Related Categories: Co2 Laser Price | E1000 | Rf Power Supply | 9.4 | 1000 Watt

diamond e1000

00 E-1000 PreInst.book

00 E-1000 PreInst.book

DIAMOND E-1000 Series OEM Lasers Preinstallation Manual 28 5. At the center of each end, carefully cut through the moisture seal bag as shown in Figure 10. Peel away the moisture seal bag and the bubble wrap underneath to expose the eye-bolt holes. Figure 10. Exposing the Eye-bolt Holes

00 E-1000 PreInst.book

00 E-1000 PreInst.book

DIAMOND E-1000 Series OEM Lasers Preinstallation Manual 30 7. Loosen and remove the wing nuts (2 places) that secure the spreader bar to the inside of the crate, then pull the spreader bar off of the bolts and lift it up (Figure 12). Figure 12. Removing Spreader from Crate

00 E-1000 PreInst.book

00 E-1000 PreInst.book

DIAMOND E-1000 Series OEM Lasers Preinstallation Manual 32 9. Cut the moisture seal bag along the groove between the laser head and RF power supply from eye-bolt to eye-bolt, then cut across the bag top at both ends (Figure 14). Figure 14. Cutting Top of Moisture Seal Bag

00 E-1000 PreInst.book

00 E-1000 PreInst.book

DIAMOND E-1000 Series OEM Lasers Preinstallation Manual 34 11. Place the laser system on a cart capable of supporting and transporting 173 kg (381 lbs.) (Figure 16). 12. Locate and remove the sealed plastic bag containing the RF power supply system cable (Figure 17). Figure 16. Place Laser System on…

00 E-1000 PreInst.book

00 E-1000 PreInst.book

DIAMOND E-1000 Series OEM Lasers Preinstallation Manual 56 System Data/Info Page This page (Figure 32) provides general system data. In addition, there is a utility to change the IP address of the system. Coherent recommends that the system be first used with its default IP address. Figure 32.…

00 E-1000 PreInst.book

00 E-1000 PreInst.book

DIAMOND E-1000 Series OEM Lasers Preinstallation Manual 28 5. At the center of each end, carefully cut through the moisture seal bag as shown in Figure 10. Peel away the moisture seal bag and the bubble wrap underneath to expose the eye-bolt holes. Figure 10. Exposing the Eye-bolt Holes

00 E-1000 PreInst.book

00 E-1000 PreInst.book

DIAMOND E-1000 Series OEM Lasers Preinstallation Manual 30 7. Loosen and remove the wing nuts (2 places) that secure the spreader bar to the inside of the crate, then pull the spreader bar off of the bolts and lift it up (Figure 12). Figure 12. Removing Spreader from Crate

00 E-1000 PreInst.book

00 E-1000 PreInst.book

DIAMOND E-1000 Series OEM Lasers Preinstallation Manual 32 9. Cut the moisture seal bag along the groove between the laser head and RF power supply from eye-bolt to eye-bolt, then cut across the bag top at both ends (Figure 14). Figure 14. Cutting Top of Moisture Seal Bag

00 E-1000 PreInst.book

00 E-1000 PreInst.book

DIAMOND E-1000 Series OEM Lasers Preinstallation Manual 34 11. Place the laser system on a cart capable of supporting and transporting 173 kg (381 lbs.) (Figure 16). 12. Locate and remove the sealed plastic bag containing the RF power supply system cable (Figure 17). Figure 16. Place Laser System on…

00 E-1000 PreInst.book

00 E-1000 PreInst.book

DIAMOND E-1000 Series OEM Lasers Preinstallation Manual 56 System Data/Info Page This page (Figure 32) provides general system data. In addition, there is a utility to change the IP address of the system. Coherent recommends that the system be first used with its default IP address. Figure 32.…

00 E-1000 PreInst.book

00 E-1000 PreInst.book

DIAMOND E-1000 Series OEM Lasers Preinstallation Manual 28 5. At the center of each end, carefully cut through the moisture seal bag as shown in Figure 10. Peel away the moisture seal bag and the bubble wrap underneath to expose the eye-bolt holes. Figure 10. Exposing the Eye-bolt Holes

00 E-1000 PreInst.book

00 E-1000 PreInst.book

DIAMOND E-1000 Series OEM Lasers Preinstallation Manual 30 7. Loosen and remove the wing nuts (2 places) that secure the spreader bar to the inside of the crate, then pull the spreader bar off of the bolts and lift it up (Figure 12). Figure 12. Removing Spreader from Crate

Powered by Site Search powered by SLI Systems

Call 1-800-227-8840


Outside the U.S. 1-408-764-4983

Coherent has locations across the globe that are available to provide support for any product, service or inquiry.

Visit our Contact Page to connect with any of our global sites.


Corporate Headquarters
Coherent Inc.
5100 Patrick Henry Drive
Santa Clara, CA 95054 USA

email: tech.sales@coherent.com

Send Us a Message

Please Read Before Continuing

Risk factors: Except for the historical information contained here, many of the matters discussed in this Web site are forward-looking statements, based on expectations at the time they were made, that involve risks and uncertainties that could cause our results to differ materially from those expressed or implied by such statements. These risks are detailed in the “Factors That May Affect Future Results” section of our latest 10-K or 10-Q filing. Coherent assumes no obligation to update these forward-looking statements.


I have read the terms and conditions