Search Results

13 - 23 of 23 Products for 'field max ii' Page 2 of 2 |

field max ii

Bio Photonics - April 2018

Bio Photonics - April 2018

…there are numerous other applications far outside the wellpublicized field of neuroscience, and these are often amply served with traditional titanium:sapphire (Ti:S) ultrafast lasers. Gabriele Bixel and colleagues at the Max Planck Institute for Molecular Biomedicine in Muenster, Germany, are using…

FieldMaxII-P User Manual

FieldMaxII-P User Manual


SECTION THREE: DESCRIPTION
Thank you for purchasing the FieldMaxII-PTM--a versatile,
easy-to-use digital energy meter designed for field service and
production applications.
In this section:
· Front panel (p. 3-2)
· Right side panel (p. 3-4)
· Left side panel…

COHR DiamondCx-10LQS DS 0118 3.pdf

COHR DiamondCx-10LQS DS 0118 3.pdf

…and Duty Cycle.
4 Gaussian Correlation based on Spiricon Near Field Raw Beam measurement at 80 cm distance from laser output, 20°C, and steady state operation at 80 kHz PRF, and 5 µsec PW.
5 Ratio based on Far Field Divergence measurement at 20°C, 80 kHz PRF, and 5 µsec PW command.

COHR DIAMOND E-1000 DS 0817 1.pdf

COHR DIAMOND E-1000 DS 0817 1.pdf

…4 LASER PRODUCT PER EN
IEC60825-1:2007/EN60825-1:2007
635 nm to 670 nm VISIBLE (1 mW)
9.1 µm to 10.8 µm INVISIBLE
2000W MAX. AVG. 6J MAX. 1 ms PULSE
471 mm
(18.6 in.)
120 mm
(4.7 in.)
203 mm
(8.0 in.)
1497 mm
(58.9 in.)
1436 mm

COHR PowerLine DS 1017 3.pdf

COHR PowerLine DS 1017 3.pdf

DB9 CONNECTOR/MONITORING
& MODULATION
0 I
LASER
Modulation & Monitoring
PWR TEMP
PWR ADJ
Max
5 VDC
Yellow LED
(laser diode "ON")
DB-9
(external monitoring
and modulation)
ON/OFF switch
Power adjustment

2011-Diode-Laser-Modules-and-Pattern-Generators-Catalog.pdf

2011-Diode-Laser-Modules-and-Pattern-Generators-Catalog.pdf

…(mW) photodiode current monitor (mV)
Pin 1
Pin 9
0 I
LASER
Modulation & Monitoring
PWR TEMP
PWR ADJ
Max
5 VDC
Yellow LED
(laser diode "ON")
DB 9
(external monitoring
and modulation)
ON OFF switch
Power adjustment…

Bio Photonics - May / June 2015

Bio Photonics - May / June 2015

…precision at microprocessing," said Dr. Max
Kahmann, product manager of TruMicro
at Trumpf GmbH in Ditzingen, Germany.
"Especially processes where any kind of
thermal influence is extremely critical,
femtosecond pulses open the field. Some
materials (e.g., nitinol) are…

COHR DiamondCx-10LDE Plus DS 0618 1a.pdf

COHR DiamondCx-10LDE Plus DS 0618 1a.pdf

…Shipping/Storage Environment -10°C to +60°C (14 to 140°F), Non-condensing
Coolant
Coolant Flow Rate
Maximum Coolant Pressure
Max. Pressure Differential (at 1.5 gpm)
Coolant Temperature
Distilled water with 25% to 35% Dow Frost
*
5.7 l/min. (1.5 gpm)
700 kPa…

VerdiFamily DS

VerdiFamily DS

…(%) ±1
Noise6 (RMS) <0.02
Polarization vertical, >100:1
Operating Voltage (VAC) 100 to 240
Frequency (HZ) 50/60
Max. Operating Current (A)(@ 100 VAC) 7.8 13
PZT Input Voltage7 (V/channel) 0 to +100
PZT Tuning Range7 (GHz) >8.2 >6.4
PZT Bandwidth7…

COHR CUBE DS 0818 4.pdf

COHR CUBE DS 0818 4.pdf


<1.0
Long-Term Power Stability (%) (8 hours) <±2 <±2 <±2
Warm-Up Time (minutes) <5 <5 <5
Spatial Mode (far field) TEM00 TEM00 TEM00
Pointing Stability (rad/°C) <6 <6 <6
Polarization Ratio4 Minimum 100:1, Vertical ±5°
Static Alignment…

Vitesse800 DSrevC

Vitesse800 DSrevC


CLASS IV LASER RADIATION PRODUCT
PER EN60825-1 (1994)

0.52-0.53 µm
0.79-0.82 µm
1.05-1.06 µm
MAX. POWER
1.0W
1.0W
10.0W
MAX. PULSE
1 mJ/10 ns
1 mJ/10 ns
2 mJ/10 ns
1 Repetition rate must be specified when ordered and will be…

Powered by Site Search powered by SLI Systems

Please Read Before Continuing

Risk factors: Except for the historical information contained here, many of the matters discussed in this Web site are forward-looking statements, based on expectations at the time they were made, that involve risks and uncertainties that could cause our results to differ materially from those expressed or implied by such statements. These risks are detailed in the “Factors That May Affect Future Results” section of our latest 10-K or 10-Q filing. Coherent assumes no obligation to update these forward-looking statements.


I have read the terms and conditions