Search Results

1 - 5 of 5 Products for 'field max ii' Page 1 of 1 |
  • 1

field max ii

FieldMaxII-TOP

FieldMaxII-TOP

…battery is drained. The meter can also operate with six standard AA batteries. Specifications Max. Measurable Power (with thermopile sensor) 30.0 kW Max. Measurable Power (with optical sensor) 300.0 mW Max. Measurable Energy (with pyroelectric sensor) 300.0J Min. Measurable Power (with thermopile…

FieldMaxII-TO

FieldMaxII-TO

…Several bug fixes including an auto-range timeout error that affected some customers using remote PC control Specifications Max. Measurable Power (with thermopile sensor) 30.0 kW Max. Measurable Power (with optical sensor) 300.0 mW Min. Measurable Power (with thermopile sensor) 10 µW Min. Measurable…

FieldMate

FieldMate

…accurate. This meter provides an economical way to perform laser power measurements and laser tuning. Specifications Max. Measurable Power (with thermopile sensor) 29.9 kW Max. Measurable Power (with optical sensor) 99.9 mW Min. Measureable Power (with thermopile sensor) 100 µW Min. Measurable…

FieldMaxII-P

FieldMaxII-P

…batteries Specifications Max. Measurable Energy (with pyroelectric sensor) 300.0J Min. Measurable Energy (with pyroelectric sensor) 1 nJ Displayable Full-Scale Energy Range (with pyroelectric sensor) 3.000 nJ to 300.0J (manual ranging) Measurement Resolution 0.1% of full scale Max. Rep. Rate (pulsed…

VarioLas UV material processing | Coherent

VarioLas UV material processing | Coherent

Field Geometry Square Square Line Substrate Field Size (mm 2) 2 x 2 2 x 2 50 x 0.6 Optical Resolution (μm) 30 5 - Working Distance (mm) 50 50 150 Max. Repetition Rate (Hz) 100 100 100 Max. Energy Density (mJ/cm 2) at 193 nm 1000 1000 230 Max. Energy Density (mJ/cm 2) at 248 nm 3500 3500 600 Max.

Powered by Site Search powered by SLI Systems

Please Read Before Continuing

Risk factors: Except for the historical information contained here, many of the matters discussed in this Web site are forward-looking statements, based on expectations at the time they were made, that involve risks and uncertainties that could cause our results to differ materially from those expressed or implied by such statements. These risks are detailed in the “Factors That May Affect Future Results” section of our latest 10-K or 10-Q filing. Coherent assumes no obligation to update these forward-looking statements.


I have read the terms and conditions