1 - 10 of 17 Search Results for sdg
|
|
|
4.
Libra PreInstallation.book
(PAGE 24 OF 35)
|
|
Libra Pre-Installation Manual 2 - 6 Synchronization and Delay Generator (SDG) The SDG controls the precise timing of the RA Pockels cells. It contains a high-speed power supply for the Pockels cells as well as a bandwidth detector (BWD) circuit, which serves as an interlock…
|
|
|
|
|
5.
SDG_HSD.QXD (Page 1)
(PAGE 2 OF 2)
|
|
…Benelux +31 (30) 280 6060 France +33 (1) 6985 5145 Germany +49 (6071) 9680 Italy +39 (02) 34 530 214 UK +44 (1353) 658 800 SDG System Specifications Trigger Input TTL-compatible, 1-50 kHz RF Sync 10-100 MHz, >100 mV peak-to-peak Outputs 1 fixed, 3 adjustable…
Related Searches: sdg 2
|
|
|
|
|
6.
Libra PreInstallation.book
(PAGE 32 OF 35)
|
|
…system. An external interlock connector is provided on the SDG Elite rear panel. In the event of an interlock fault during normal operation, the Pockels cells are disabled which terminates Libra output. Refer to the SDG Elite Operator's manual for more details. Alternatively, the…
|
|
|
|
|
7.
UCLD_Catalog.book
(PAGE 25 OF 37)
|
|
…Amplification, Review of optical beam paths, Demonstration of alignment optimization, System optimization, Maintenance procedures, Optics cleaning, SDG timing, Turn on/off procedures, Discussion of available/typical diagnostics, Troubleshooting scenarios. Prerequisites: The students must have…
Related Searches: silhouette
|
|
|
|
|
8.
UCLD_Catalog.book
(PAGE 26 OF 37)
|
|
…beam paths, Demonstration of alignment optimization, System optimization, Software control and instructions, Maintenance procedures, Optics cleaning, SDG timing, Diode calibration, Turn on/off procedures, Discussion of available/typical diagnostics, Troubleshooting scenarios. Prerequisites: A…
Related Searches: sdg 2
|
|
|
|
|
9.
UCLD_Catalog.book
(PAGE 21 OF 35)
|
|
…Amplification; review of optical beam paths; demonstration of alignment optimization; system optimization; maintenance procedures; optics cleaning; SDG timing; turn on/off procedures; discussion of available/typical diagnostics; troubleshooting scenarios. Prerequisites: Students must have attended…
|
|
|
|
|
10.
UCLD_Catalog.book
(PAGE 22 OF 35)
|
|
…paths; demonstration of alignment optimization; system optimization; software control and instructions; maintenance procedures; optics cleaning; SDG timing; diode calibration; turn on/off procedures; discussion of available/typical diagnostics; troubleshooting scenarios. Prerequisites: A…
|
|