Preinstallation Manual VerdiTM V-18 Diode-Pumped Lasers 5100 Patrick Henry Drive Santa Clara, CA 95054 Verdi V-18 Laser Preinstallation Manual ii This document is copyrighted with all rights reserved. Under the copyright laws, this document may not be copied in whole or in part or reproduced in any ... Related Searches:verdi 18 | v18 | fap-i | verdi manual
Verdi V-18 Laser Preinstallation Manual ii This document is copyrighted with all rights reserved. Under the copyright laws, this document may not be copied in whole or in part or reproduced in any other media without the express written permission of Coherent, Inc. Permitted copies must carry the same ...
Verdi V-18 Laser Preinstallation Manual iv Preface This manual contains user information for the VerdiTM V-18 Diode-Pumped Lasers. Read the Operator's Manual carefully before operating the laser for the first time. Special attention should be given to the material in Section One, Laser Safety, that ...
Verdi V-18 Laser Preinstallation Manual 1 Introduction The purpose of this document is to assist the user in establishing a suitable location and operating environment for optimum Verdi V-18 performance. Receiving and Inspection Inspect shipping containers for signs of rough handling or damage. Indicate ... Related Searches:verdi manual | mira manual
Verdi V-18 Laser Preinstallation Manual 2 1. Riser/heat sink installation hardware 2. Operator's manual 3. AC power cord 4. Power supply key 5. Installation kit case 6. Interlock-disassembled 7. Fuses and instructions 8. FAP-I installation hardware, including shorting clips, end caps, etc. 9. Laser ... Related Searches:verdi v18
Verdi V-18 Laser Preinstallation Manual 3 The laser head is shipped with a protective plastic plate installed over the baseplate. Leave the plastic plate in place until laser head is ready for installation. 1. Remove the packing material from the riser/heat sink (Figure 1-2). 2. Insert two dowel pins ...
Verdi V-18 Laser Preinstallation Manual 5 6. Proceed to the paragraph titled, "Installing the Power Supply". The riser/heat sink clamps and chiller connection will be installed during the final installation procedures. Installing the Power Supply 1. Move the power supply to an accessible ...