Preinstallation Manual VerdiTM V-8/V-10 Diode-Pumped Lasers 5100 Patrick Henry Drive Santa Clara, CA 95054 Verdi V-8/V-10 Laser Preinstallation Manual ii This document is copyrighted with all rights reserved. Under the copyright laws, this document may not be copied in whole or in part or reproduced ... Related Searches:verdi manual | verdi 10 | water chiller | logo
Verdi V-8/V-10 Laser Preinstallation Manual iv Preface This manual contains user information for the VerdiTM V-8/V-10 Diode-Pumped Lasers. Read the Operator's Manual carefully before operating the laser for the first time. Special attention should be given to the material in Section One, Laser Safety ... Related Searches:verdi manual
Verdi V-8/V-10 Laser Preinstallation Manual 1 Introduction The purpose of this document is to assist the user in establishing a suitable location and operating environment for optimum Verdi V-8/V-10 performance. Receiving and Inspection Inspect shipping containers for signs of rough handling or damage ... Related Searches:mira manual | verdi v8
Verdi V-8/V-10 Laser Preinstallation Manual 2 1. Riser/heat sink installation hardware 2. Operator's manual 3. AC power cord 4. Power supply key 5. Installation kit case 6. Interlock-disassembled 7. Fuses and instructions 8. FAP-I installation hardware, including shorting clips, end caps, etc. 9. Laser ...
Verdi V-8/V-10 Laser Preinstallation Manual 3 The laser head is shipped with a protective plastic plate installed over the baseplate. Leave the plastic plate in place until laser head is ready for installation. 1. Remove the packing material from the riser/heat sink (Figure 1-2). 2. Insert two dowel ... Related Searches:verdi v10 manual
Verdi V-8/V-10 Laser Preinstallation Manual 5 6. Proceed to the paragraph titled, "Installing the Power Supply". The riser/heat sink clamps and chiller connection will be installed during the final installation procedures. Installing the Power Supply 1. Move the power supply to an accessible ...
Verdi V-8/V-10 Laser Preinstallation Manual 6 Each customer must inspect the power cord and install the proper connector if necessary. The connector should be installed in a properly grounded outlet with a maximum of 16 Ampere service @ 110 V and 11 Ampere service @ 220 V for proper overcurrent and ... Related Searches:verdi laser manual
Verdi V-8/V-10 Laser Preinstallation Manual 7 External Interlock The system will not operate with the interlock open. An interlock connector is located on the power supply rear panel. The interlock status is monitored by the CPU. If the interlock is open, the message, "External Interlock Fault ...