1 - 10 of 54 Search Results for verdi laser manual
|
|
2.
Verdi_V2-V5-V6_Preinstallation
(PAGE 10 OF 18)
|
|
|
Verdi V-2/V-5/V-6 Laser Preinstallation Manual 4 1. Dowel holes (2) 2. Cooling water inlet and outlet (if included) 3. Laser head clamp screw holes (4) 4. Optical table clamp mounts (4) Figure 1-2. Riser/Heatsink 1. Laser head 2. Protective plastic cover retaining screws (3) 3. Protective material ...
|
|
|
|
|
4.
Clogged Water Flow
|
|
... experience Supporting critical environments Highest level of post-sale customer care Long-term customer relationships Clogged Water Flow For Avia, Verdi and Vitesse lasers – Ensure distilled water is used in the chiller. Do not use deionized water, or hard water. Deionized water is corrosive. Hard ...
Related Searches: water chiller | chiller | verdi chiller
|
|
|
|
|
5.
Battery Requires Service
|
|
... 40+ years of experience Supporting critical environments Highest level of post-sale customer care Long-term customer relationships For Avia, Verdi and Vitesse lasers – Allow time for the battery to recharge. The system tests the battery charge during the first few seconds after the system is powered ...
Related Searches: verdi manual | shg
|
|
|
|
8.
Verdi_V8-V10_Preinstallation
(PAGE 12 OF 18)
|
|
Verdi V-8/V-10 Laser Preinstallation Manual 6 Each customer must inspect the power cord and install the proper connector if necessary. The connector should be installed in a properly grounded outlet with a maximum of 16 Ampere service @ 110 V and 11 Ampere service @ 220 V for proper overcurrent and ...
Related Searches: cooling
|
|
|
|
10.
Verdi_V2-V5-V6_Preinstallation
(PAGE 12 OF 18)
|
|
|
Verdi V-2/V-5/V-6 Laser Preinstallation Manual 6 Each customer must inspect the power cord and install the proper connector if necessary. The connector should be installed in a properly grounded outlet with a maximum of 10 Ampere service @ 110 V and 11 Ampere service @ 220 V for proper overcurrent ...
|
|