Preinstallation Manual VerdiTM V-2/V-5/V-6 Diode-Pumped Lasers 5100 Patrick Henry Drive Santa Clara, CA 95054 Verdi V-2/V-5/V-6 Laser Preinstallation Manual ii This document is copyrighted with all rights reserved. Under the copyright laws, this document may not be copied in whole or in part or reproduced ... Related Searches:verdi v2 manual | verdi v6 | water chiller verdi
Verdi V-2/V-5/V-6 Laser Preinstallation Manual 3 The laser head is shipped with a protective plastic plate installed over the baseplate. Leave the plastic plate in place until laser head is ready for installation. 1. Remove the packing material from the riser/heat sink (Figure 1-2). 2. Insert two dowel ...
Verdi V-2/V-5/V-6 Laser Preinstallation Manual 5 6. Proceed to the paragraph titled, "Installing the Power Supply". The riser/heat sink clamps and chiller connection will be installed during the final installation procedures. Installing the Power Supply 1. Move the power supply to an accessible ...
Verdi V-2/V-5/V-6 Laser Preinstallation Manual 6 Each customer must inspect the power cord and install the proper connector if necessary. The connector should be installed in a properly grounded outlet with a maximum of 10 Ampere service @ 110 V and 11 Ampere service @ 220 V for proper overcurrent ... Related Searches:verdi laser manual
Verdi V-2/V-5/V-6 Laser Preinstallation Manual 7 7. Perform the procedure in paragraph titled, "Turn-on (Cold-Start)" in the Operator's Manual. External Interlock The system will not operate with the interlock open. An interlock connector is located on the power supply rear panel. The interlock ... Related Searches:verdi v5 | wiring diagrams
Verdi V-2/V-5/V-6 Laser Preinstallation Manual 8 5. The interlock circuit in Verdi operates from a +/-12 VDC circuit. Its current is limited to around 1 mA. For these ratings, a "dry-circuit" type switch will give the most reliable operation. Figure 1-6. Interconnect Diagram Table 1-1. Utility ...