Ask a Question
Coherent
Search Results
Refine

Result Type

1 - 12 of 72 Products for 'verdi v5' Page 1 of 6 |

verdi v5

Verdi preinstall.book

Verdi preinstall.book

Verdi V-2/V-5/V-6 Laser Preinstallation Manual 9 Dimensions Table 1-2. Environmental Requirements PARAMETER REQUIREMENT Operating temperature 15 to 35°C (59 to 95°F) Relative humidity 5 to 95% (non condensing) Altitude Sea level to 10,000 feet Figure 1-7. Laser Head Dimensions

Verdi preinstall.book

Verdi preinstall.book

Verdi V-2/V-5/V-6 Laser Preinstallation Manual 2 1. Riser/heat sink installation hardware 2. Operator's manual 3. AC power cord 4. Power supply key 5. Installation kit case 6. Interlock-disassembled 7. Fuses and instructions 8. FAP-I installation hardware, including shorting clips, end caps, etc. 9.…

Verdi preinstall.book

Verdi preinstall.book

Verdi V-2/V-5/V-6 Laser Preinstallation Manual 10 Figure 1-8. Power Supply Dimensions

Verdi preinstall.book

Verdi preinstall.book

Verdi V-2/V-5/V-6 Laser Preinstallation Manual vi

Mira-Optima-900-F-Data-Sheet.pdf

Mira-Optima-900-F-Data-Sheet.pdf

…M2 value is 1.1 0.0 700 1.8 750 800 850 900 950 1000 Wavelength (nm) OutputPower(W) 10W Verdi pump 8W Verdi pump 5W Verdi pump 0.0 700 Wavelength (nm) OutputPower(W) 10W Verdi pump 8W Verdi pump 5W Verdi pump 750 800 850 900 950 1000 0.4 0.8 1.2 1.6 2.0 1.6 1.4 1.2 1.0 0.8 0.6 0.4 0.2 Typical…

Verdi preinstall.book

Verdi preinstall.book

Verdi V-2/V-5/V-6 Laser Preinstallation Manual 11

Verdi preinstall.book

Verdi preinstall.book

Verdi V-2/V-5/V-6 Laser Preinstallation Manual 2 1. Riser/heat sink installation hardware 2. Operator's manual 3. AC power cord 4. Power supply key 5. Installation kit case 6. Interlock-disassembled 7. Fuses and instructions 8. FAP-I installation hardware, including shorting clips, end caps, etc. 9.…

Verdi preinstall.book

Verdi preinstall.book

Verdi V-2/V-5/V-6 Laser Preinstallation Manual 11

Verdi preinstall.book

Verdi preinstall.book

Verdi V-2/V-5/V-6 Laser Preinstallation Manual vi

Verdi preinstall.book

Verdi preinstall.book

Verdi V-2/V-5/V-6 Laser Preinstallation Manual 4 1. Dowel holes (2) 2. Cooling water inlet and outlet (if included) 3. Laser head clamp screw holes (4) 4. Optical table clamp mounts (4) Figure 1-2. Riser/Heatsink 1. Laser head 2. Protective plastic cover retaining screws (3) 3. Protective material…

Verdi preinstall.book

Verdi preinstall.book

Verdi V-2/V-5/V-6 Laser Preinstallation Manual vi

Verdi preinstall.book

Verdi preinstall.book

Verdi V-2/V-5/V-6 Laser Preinstallation Manual 5 6. Proceed to the paragraph titled, "Installing the Power Supply". The riser/heat sink clamps and chiller connection will be installed during the final installation procedures. Installing the Power Supply 1. Move the power supply to an…

Powered by Site Search powered by SLI Systems

Call 1-800-227-8840


Outside the U.S. 1-408-764-4983

Coherent has locations across the globe that are available to provide support for any product, service or inquiry.

Visit our Contact Page to connect with any of our global sites.


Corporate Headquarters
Coherent Inc.
5100 Patrick Henry Drive
Santa Clara, CA 95054 USA

email: tech.sales@coherent.com

Send Us a Message

Please Read Before Continuing

Risk factors: Except for the historical information contained here, many of the matters discussed in this Web site are forward-looking statements, based on expectations at the time they were made, that involve risks and uncertainties that could cause our results to differ materially from those expressed or implied by such statements. These risks are detailed in the “Factors That May Affect Future Results” section of our latest 10-K or 10-Q filing. Coherent assumes no obligation to update these forward-looking statements.


I have read the terms and conditions