Ask a Question
Coherent

Search Results

1 - 12 of 68 Products for 'verdi v6' Page 1 of 6 |
Related Categories: Beam Profiler | Verdi V18 | Verdi V10 | Verdi | Verdi 5w

verdi v6

Verdi V-Series

Verdi V-Series

…6W - V6 7W G7 - 8W G8 V8 10W G10 V10 12W G12 V12 15W G15 - 18W G18 V18 20W G20 - Datasheet Verdi Family Data Sheet Drawing Verdi V Series Applications Application Amplifier Seeding Holography Interferometry Atom Cooling and Trapping Continuous Wave OPO Pumping --> Features & Benefits The Verdi

Verdi preinstall.book

Verdi preinstall.book

Verdi V-2/V-5/V-6 Laser Preinstallation Manual 3 The laser head is shipped with a protective plastic plate installed over the baseplate. Leave the plastic plate in place until laser head is ready for installation. 1. Remove the packing material from the riser/heat sink (Figure 1-2). 2. Insert two…

Verdi preinstall.book

Verdi preinstall.book

Verdi V-2/V-5/V-6 Laser Preinstallation Manual 4 1. Dowel holes (2) 2. Cooling water inlet and outlet (if included) 3. Laser head clamp screw holes (4) 4. Optical table clamp mounts (4) Figure 1-2. Riser/Heatsink 1. Laser head 2. Protective plastic cover retaining screws (3) 3. Protective material…

Verdi preinstall.book

Verdi preinstall.book

Verdi V-2/V-5/V-6 Laser Preinstallation Manual 11

VerdiFamily DS

VerdiFamily DS

Verdi V2 V6 V8 V10 V12 V18 Output Power (W) >2 >6 >8 >10 >12 >18 Wavelength (nm) 532 Linewidth1 (MHz) 100:1 Operating Voltage (VAC) 100 to 240 Frequency (HZ) 50/60 Max. Operating Current (A)(@ 100 VAC) 7.8 13 PZT Input Voltage7 (V/channel) 0 to +100 PZT Tuning Range7 (GHz) >8.2 >6.4 PZT Bandwidth7…

Verdi preinstall.book

Verdi preinstall.book

Verdi V-2/V-5/V-6 Laser Preinstallation Manual 10 Figure 1-8. Power Supply Dimensions

Verdi preinstall.book

Verdi preinstall.book

Verdi V-2/V-5/V-6 Laser Preinstallation Manual vi

Verdi preinstall.book

Verdi preinstall.book

Verdi V-2/V-5/V-6 Laser Preinstallation Manual 9 Dimensions Table 1-2. Environmental Requirements PARAMETER REQUIREMENT Operating temperature 15 to 35°C (59 to 95°F) Relative humidity 5 to 95% (non condensing) Altitude Sea level to 10,000 feet Figure 1-7. Laser Head Dimensions

Verdi preinstall.book

Verdi preinstall.book

Verdi V-2/V-5/V-6 Laser Preinstallation Manual 8 5. The interlock circuit in Verdi operates from a +/-12 VDC circuit. Its current is limited to around 1 mA. For these ratings, a "dry-circuit" type switch will give the most reliable operation. Figure 1-6. Interconnect Diagram Table 1-1. Utility…

Verdi preinstall.book

Verdi preinstall.book

Verdi V-2/V-5/V-6 Laser Preinstallation Manual 8 5. The interlock circuit in Verdi operates from a +/-12 VDC circuit. Its current is limited to around 1 mA. For these ratings, a "dry-circuit" type switch will give the most reliable operation. Figure 1-6. Interconnect Diagram Table 1-1. Utility…

Verdi preinstall.book

Verdi preinstall.book

Verdi V-2/V-5/V-6 Laser Preinstallation Manual 6 Each customer must inspect the power cord and install the proper connector if necessary. The connector should be installed in a properly grounded outlet with a maximum of 10 Ampere service @ 110 V and 11 Ampere service @ 220 V for proper overcurrent…

Verdi Lasers

Verdi Lasers

…20 W at 532 nm. Data Sheet Verdi G Series Family Verdi V Series Verdi V Series Compact DPSS lasers suited for Ti:Sapphire pumping enabling the lowest CW noise. Data Sheet Verdi Family Data Sheet Power Ti:Sapphire Pumping Single Frequency 2W G2 G2 SLM 5W G5 G5 SLM 6W - V6 7W G7 - 8W G8 V8 10W G10 V10…

Powered by Site Search powered by SLI Systems

Please Read Before Continuing

Risk factors: Except for the historical information contained here, many of the matters discussed in this Web site are forward-looking statements, based on expectations at the time they were made, that involve risks and uncertainties that could cause our results to differ materially from those expressed or implied by such statements. These risks are detailed in the “Factors That May Affect Future Results” section of our latest 10-K or 10-Q filing. Coherent assumes no obligation to update these forward-looking statements.


I have read the terms and conditions